Not much room left for drainage and stormwater pipes to be connected up. Specific auto shut off value for storm flow is required so tanks don’t over flow. Tanks here are being tested for any leaks before they are locked in place for ever from overhead slab.
Advertisement
Leave a Comment
No comments yet.
Comments RSS TrackBack Identifier URI

